Bored piling
Material strength |
kPa |
Material strength(Relative Density) = SPT N-value(blows/300mm) x2 or Density Index |
Bored piling productivity | ||
---|---|---|
Total bored pile productivity per shift | 0.00 | m/shift |
Specialised hard rock excavation only (Equipment DTH hammer) | 8.00 | m/shift |