Piling productivity

Bored piling

Material strength

kPa
Material strength(Relative Density) = SPT N-value(blows/300mm) x2 or Density Index
Bored piling productivity
Total bored pile productivity per shift 0.00 m/shift
Specialised hard rock excavation only (Equipment DTH hammer) 8.00 m/shift